At first, the Jai Hind metro station was prepared to get elevated. Nevertheless, the AAI objected which the elevated stretch up into the airport could possibly pose a threat to plane, Therefore the route was more reworked and also the station was shifted underground, 150 m from your Airport terminal constructing. https://railway-kolkata55556.atualblog.com/39417027/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf