At first, the Jai Hind metro station was prepared for being elevated. On the other hand, the AAI objected that the elevated stretch up to the airport could pose a danger to aircraft, Hence the route was even more reworked along with the station was shifted underground, 150 m through the https://railway-kolkata08350.timeblog.net/68979311/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf